Left: While in the VAB, the crawler transporter positions alone below Cellular Launcher 1 in preparation for rollout of SA-501 on the start pad – note the worker inside the foreground for sizing comparison. Insufficient a second Saturn V manufacturing run killed this prepare and still left The usa https://edge-ai32973.csublogs.com/40910489/the-2-minute-rule-for-apollo4-blue-plus