Install the Coir Matting within the trench. Put at the very least twelve inches from the roll previously mentioned the trench (even more up the slope). Space each staple a few foot aside Within the trench Positioning: Spot the coir logs on the waterline or alongside the sting in the https://juliusmsvwx.p2blogs.com/32889999/coir-mats-things-to-know-before-you-buy